A303 Stonehenge Highways England DCO Application

301 documents were uploaded by the Planning Inspectorate in random order ahead of the Planning Inspectorate’s decision on whether to accept Highways England’s application.  Eventually they will be indexed, but for immediate convenience we have reordered them into subject areas.

This application was received by the Planning Inspectorate on 19 October 2018.

“The Applicant has agreed that all application documents can be published as soon as practicable upon submission to help everyone become familiar with the detail of what is being proposed in this application.

“This provision is solely for the purpose of allowing more time to all those who wish to become familiar with the detail of what is being proposed ahead of the Relevant Representation stage, without lengthening the overall time required for the application process. There will be no opportunity at this stage to make comments on the application. However, if the application is accepted anyone interested in the application will be able to register and express their views during the Relevant Representation stage and the subsequent Examination.”

Planning Inspectorate, 19 October 2018

STOP PRESS: THIS APPLICATION HAS BEEN ACCEPTED.  PLEASE VISIT THE PLANNING INSPECTORATE WEBSITE.

Prefixed numbers are those given in the list order of documents placed on Inspectorate website for current ease of reference. Our explanatory labels are in square brackets.

APPLICATION FORM FUNCTIONS (3)

  1. 1.1 Introduction to the Application 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000152-1-1-Introduction-to-the-Application.pdf
  2. 1.2 Covering letter and schedule of compliance with s55 414KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000153-1-2-Covering_letter-s55-checklist.pdf
  3. 1.3 Application form 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000154-1-3-Application-Form.pdf

PLANS (6)

  1. 2.1 Location Plan 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000156-2-1-LocationPlan.pdf
  2. 2.2 Land Plans 13MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000157-2-2-LandPlans.pdf
  3. 2.3 Special Category Land Plans [NT ownership etc.] 13MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000158-2-3-SpecialCategoryLandPlans.pdf
  4. 2.4 Crown Land Plans 11MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000159-2-4-CrownLandPlans.pdf
  5. 2.5 Works Plans 17MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000160-2-5-WorksPlans.pdf
  6. 2.6 Rights of Way and Access Plans 17MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000161-2-6-RightsOfWayAndAccessPlans.pdf

DRAWINGS (10)

  1. 2.7 Engineering Section Drawings plans and profiles 33MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000162-2-7-EngineeringSections_PlanProfile.pdf
  1. 2.8 Engineering Section Drawings [SCHEME PLANS] 11MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000163-2-8-EngineeringSections_CrossSections.pdf
  1. 2.9 General Arrangement Drawings [SCHEME PLAN DRAWINGS] 20MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000164-2-9-GeneralArrangementPlans.pdf
266. 2.10 Traffic Regulation Measures Plans 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000165-2-10-TrafficRegulation_SpeedLimits.pdf
267. 2.11 Traffic Regulation Measures Plans 13MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000166-2-11-TrafficRegulation_Clearways_Prohibitions.pdf

  1. 2.12 De-Trunking Plans 10MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000167-2-12-DetrunkingPlans.pdf
  2. 2.13 Classification of Roads Plans 7MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000168-2-13-ClassificationOfRoadPlans.pdf
  3. 2.14 Structures Drawings [tunnel, green bridges, signage etc.] 40MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000169-2-14-StructuresDrawings.pdf
  4. 2.15 Tunnel Area Plan 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000170-2-15-TunnelOperationalAreaPlan.pdf
  5. 2.16 Tunnel Limits of Deviation Plan 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000171-2-16-Tunnel_LOD_Plan.pdf

REPORTS (14)

  1. 6.5 Statement of statutory nuisances [environmental impacts during and after construction] 7MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000446-6-5-Statement-of-statutory-nuisance.pdf

[CONSULTATION]

  1. 5.1 Consultation Report 8MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000179-5-1-Consultation-Report.pdf
  2. 5.1 Consultation Report – Appendix A Compliance checklist 723KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000180-5-1-Consultation-Report-Appendix-A.pdf
  3. 5.1 Consultation Report – Appendix B Consultation and engagement overview 9MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000181-5-1-Consultation-Report-Appendix-B.pdf
  4. 5.1 Consultation Report – Appendix C (SoCC) Development of the Statement of Community Consultation (SoCC). 7MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000182-5-1-Consultation-Report-Appendix-C.pdf
  5. 6.1 Consultation Report – Appendix D Consultation maps: authorities, adjacent parishes, consultation zone and boundary. 19MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000183-5-1-Consultation-Report-Appendix-D.pdf
  6. 5.1 Consultation Report – Appendix E Statutory consultee identification and engagement. 15MB.https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000184-5-1-Consultation-Report-Appendix-E.pdf
  7. 5.1 Consultation Report – Appendix F. Section 47 consultation [statutory]130MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000185-5-1-Consultation-Report-Appendix-F.pdf
  8. 5.1 Consultation Report – Appendix G 101MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000186-5-1-Consultation-Report-Appendix-G.pdf
  9. 5.1 Consultation Report – Appendix H (Additional consultees) 1MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000187-5-1-Consultation-Report-Appendix-H.pdf
  10. 5.1 Consultation Report – Appendix I Extended consultation. 82MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000188-5-1-Consultation-Report-Appendix-I.pdf
  11. 6.1 Consultation Report – Appendix J [supplementary consultation] 26MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000189-5-1-Consultation-Report-Appendix-J.pdf
  12. 5.1 Consultation Report – Appendix K Responses to Stat consultation. 8MBhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000190-5-1-Consultation-Report-Appendix-K.pdf
  13. 3.3 Consents and Agreements Position Statement 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000175-3-3-Consents-and-Agreements_Position-Statement.pdf

COMPULSORY PURCHASE INFORMATION (2)

  1. 4.1 Statement of Reasons 471KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000176-4-1-Statement-of-reasons.pdf
  2. 4.2 Funding Statement 7MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000177-4-2-Funding-Statement.pdf

DRAFT DEVELOPMENT CONSENT ORDERS (2 (?3)) 

  1. 3.1 Draft Development Consent Order 482KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000172-3-1-Draft-DCO.pdf
  2. 3.2 Explanatory Memorandum https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000174-3-2-Explanatory-memorandum-to-draft-DCO.pdf 246KB.
  3. 3.3 Consents and Agreements Position Statement 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000175-3-3-Consents-and-Agreements_Position-Statement.pdf

OTHER DOCUMENTS (9)

  1. 7.1 Case for the Scheme and NPS accordance 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000447-7-1-Case-for-the-Scheme.pdf
  2. 7.2 Design and Access Statement. 45MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000448-7-2-DAS.pdf
  3. 7.3 Equality Impact Assessment 693KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000449-7-3_EqIA.pdf
  4. 7.4 Transport Assessment 28MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000450-7-4-Transport-Assessment.pdf
  5. 7.5 Combined Modelling and Appraisal Report [economic/traffic etc.] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000451-7-5-ComMA.pdf
  6. 7.5 Combined Modelling and Appraisal Report – Appendix A Transport Data Package, Appendix A to the Combined Modelling and Appraisal Report (Application Document 7.5) 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000452-7-5-ComMA-Appendix-A.pdf
  7. 7.5 Combined Modelling and Appraisal Report – Appendix B Transport Model Package, Appendix B to the Combined Modelling and Appraisal Report (Application Document 7.5)20MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000453-7-5-ComMA-Appendix-B.pdf
  8. 7.5 Combined Modelling and Appraisal Report – Appendix C 140MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000454-7-5-ComMA-Appendix-C.pdf
  9. 7.5 Combined Modelling and Appraisal Report – Appendix D Economic Appraisal package 17MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000455-7-5-ComMA-Appendix-D.pdf

ENVIRONMENTAL STATEMENT (255)

ES NON-TECHNICAL SUMMARY (NTS) – ES Vol. 4 (DCO doc. ref. 6.4)

  1. 6.4. A303 Amesbury to Berwick Down TR010025 Environmental Statement Non-Technical Summary

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000445-6-4_ES-NTS.pdf 38MB

ES VOL. 1 (DCO Doc. ref. 6.1)

  1. 6.1 Environmental statement – Chapter 0 Table of Contents, Glossary and Abbreviations 565KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000191-6-1_ES_Chapters_00_Table%20of%20Contents.pdf
  2. 6.1 Environmental statement Chapter 1 – Introduction 294KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000192-6-1_ES_Chapters_01_Introduction.pdf
  3. 6.1 Environmental statement Chapter 2 – The Proposed Scheme 630KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000193-6-1_ES_Chapters_02_TheScheme.pdf
  1. 6.1 Environmental statement Chapter 3 – Assessment of alternatives 303KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000194-6-1_ES_Chapters_03_Alternatives.pdf
  2. 6.1 Environmental statement Chapter 4 – Environmental Assessment Methodology 184KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000195-6-1_ES_Chapters_04_Methodology.pdf
  3. 6.1 Environmental statement Chapter 5 – Air Quality 421KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000196-6-1_ES_Chapters_05_AirQuality.pdf
  4. 6.1 Environmental statement Chapter 6 – Cultural Heritage. 667KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000197-6-1_ES_Chapters_06_CulturalHeritage.pdf

  1. 6.1 Environmental statement Chapter 7 – Landscape and Visual Effects 1MBhttps://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000198-6-1_ES_Chapters_07_LandscapeAndVisual.pdf
  2. 6.1 Environmental statement Chapter 8 – Biodiversity 701KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000199-6-1_ES_Chapters_08_Biodiversity.pdf
  3. 6.1 Environmental statement Chapter 9 – Noise and Vibration 517KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000200-6-1_ES_Chapters_09_NoiseAndVibration.pdf
  4. 6.1 Environmental statement Chapter 10 – Geology and Soils 419KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000201-6-1_ES_Chapters_10_GeologyAndSoils.pdf
  5. 6.1 Environmental statement Chapter 11 – Road Drainage and the Water Environment 396KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000202-6-1_ES_Chapters_11_DrainageAndWater.pdf
  6. 6.1 Environmental statement Chapter 12 – Materials [material assets and waste] 262KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000203-6-1_ES_Chapters_12_MaterialAndWaste.pdf
  7. 6.1 Environmental statement Chapter 13 – People and Communities 503KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000204-6-1_ES_Chapters_13_PeopleAndCommunities.pdf
  8. 6.1 Environmental statement Chapter 14 – Climate [change] 237KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000205-6-1_ES_Chapters_14_ClimateChange.pdf
  9. 6.1 Environmental statement Chapter 15 – Assessment of Cumulative Effects [all receptors]. 143KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000206-6-1_ES_Chapters_15_CumulativeEffects.pdf
  10. 6.1 Environmental statement Chapter 16 – Summary of Effects [all receptors] 96KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000207-6-1_ES_Chapters_16_SummaryOfEffects.pdf

EVIRONMENTAL STATEMENT VOL. 2 FIGURES (DCO Doc ref. 6.2.)

  1. 6.2 Environmental Statement Figure 00 – Table of Contents [Figures] 70KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000208-6-2_ES-Figure_0.0_TableOfContents.pdf
  2. 6.2 Environmental Statement Figure 1.1: Proposed scheme 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000209-6-2_ES-Figure_1.1_SchemeLocation.pdf
  3. 219. 2 Environmental Statement Figure 2.1Proposed scheme boundary 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000210-6-2_ES-Figure_2.1_SchemeBoundary.pdf
  4. 6.2 Environmental Statement Figure 2.2 A-YEngineering plan & profiles 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000211-6-2_ES-Figure_2.2_PlanAndProfile.pdf

Figure 2.3 Example of a green bridge (Weymouth Relief Road) (Embedded in Chapter 2, Vol. 1)

Figure 2.4 Changes to rights of way at eastern end of Scheme (Embedded in Chapter 2, Vol. 1)

  1. 6.2 Environmental Statement Figure 2.5 A-S – Environmental masterplan 28MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000212-6-2_ES-Figure_2.5_EnvironmentalMasterplan.pdf
  2. 6.2 Environmental Statement Figure 2.6 – High load and diversionary route 4MB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000213-6-2_ES-Figure_2.6_HighLoad_DiversionRoute.pdf

  1. 6.2 Environmental Statement Figure 2.7 A-E – Illustrative construction layout including compounds and haul routes 7MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000214-6-2_ES-Figure_2.7_ConstructionLayout.pdf

Figure 2.8 Conceptual geology model – cross section of tunnel (Embedded in Chapter 2, Volume 1)

Figure 3.1 Option identification and selection process (Embedded in Chapter 3, Volume 1)

[No Figure 4]

  1. 6.2 Environmental Statement Figure 5.1 – Air quality study area 8MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000215-6-2_ES-Figure_5.1_AQ_StudyArea.pdf

  1. 6.2 Environmental Statement Figure 5.2 A-HAir quality Baseline 29MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000216-6-2_ES-Figure_5.2_AQ_Baseline.pdf
  1. 6.2 Environmental Statement Figure 5.3 A-HAir quality modelling (operational) 29MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000217-6-2_ES-Figure_5.3_AQ_Modelling_Operational.pdf
  2. 6.2 Environmental Statement Figure 5.4 A-H – Air quality modelling (construction phase 1) 29MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000218-6-2_ES-Figure_5.4_AQ_Modelling_ConstructionPhase1.pdf.
  3. 6.2 Environmental Statement Figure 5.5 A-H – Air quality modelling (construction phase 2) 29MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000219-6-2_ES-Figure_5.5_AQ_Modelling_ConstructionPhase2.pdf
  4. 6.2 Environmental Statement Figure 6.1 – Cultural Heritage Study Areas 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000220-6-2_ES-Figure_6.1_CH_StudyAreas.pdf
  5. 6.2 Environmental Statement Figure 6.2 – Scheduled Monuments Overview Sheet 6MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000221-6-2_ES-Figure_6.2_CH_ScheduledMonumentsOverview.pdf
  6. 6.2 Environmental Statement Figure 6.3 A-E – Scheduled Monuments 11MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000222-6-2_ES-Figure_6.3_ScheduledMonuments.pdf
  7. 6.2 Environmental Statement Figure 6.4 – Designated Historic Buildings Overview Sheet [map] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000223-6-2_ES-Figure_6.4_CH_DesignatedHistoricBuildingsOverview.pdf
  8. 6.2 Environmental Statement Figure 6.5 A-E – Designated Historic Buildings [maps/historic parks/CAs etc.] 10MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000224-6-2_ES-Figure_6.5_CH_DesignatedHistoricBuildings.pdf
  9. 6.2 Environmental Statement Figure 6.6 – Cultural Heritage Asset Groups [map] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000225-6-2_ES-Figure_6.6_CH_AssetGroups.pdf
  1. 6.2 Environmental Statement Figure 6.7 – 500m Study Area Overview Sheet 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000226-6-2_ES-Figure_6.7_CH_StudyArea500m_Overview.pdf
  1. 6.2 Environmental Statement Figure 6.8 A-E – Archaeological Assets within 500m Study Area [maps/plots showing areas of archaeological activity]. 7MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000227-6-2_ES-Figure_6.8_CH_ArchaeologicalAssets500m_StudyArea.pdf

  1. 6.2 Environmental Statement Figure 6.9 A-G – Historic Buildings within the 500m Study Area [maps/plans] 8MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000228-6-2_ES-Figure_6.9_HistoricBuildings500m_StudyArea.pdf
  2. 6.2 Environmental Statement Figure 6.10 – Historic Landscape Characterisation [map] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000229-6-2_ES-Figure_6.10_CH_HistoricLandscapeCharacterisation.pdf
  3. 6.2 Environmental Statement Figure 6.11 A-E – Historic Landscape Character Areas 9MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000230-6-2_ES-Figure_6.11_CH_HistoricLandscapeCharacterAreas.pdf
  4. 6.2 Environmental Statement Figure 6.12 AProposed Scheme Zone of Theoretical Visibility (ZTV) in relation to Heritage Assets 22MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000231-6-2_ES-Figure_6.12A-E_CH_ZTV.pdf

Includes the following:

  • Figure 6.12A Proposed Scheme Zone of Theoretical Visibility in relation to the Stonehenge World Heritage Site
  • Figure 6.12B Proposed Scheme Zone of Theoretical Visibility in relation to Scheduled Monuments
  • Figure 6.12C Proposed Scheme Zone of Theoretical Visibility in relation to Listed Buildings
  • Figure 6.12D Proposed Scheme zone of theoretical visibility in relation to Registered Parks and Gardens and Conservation Areas

Figure 7.1 LVIA study area (Embedded in Chapter 7, Volume 1)

  1. 6.2 Environmental Statement Figure 7.1LVIA Study Area. 3MB. [Same as above doc?] https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000232-6-2_ES-Figure_7.1_LVIA_StudyArea.pdf
  1. 6.2 Environmental Statement Figure 7.2LVIA Topography and Watercourses [map] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000233-6-2_ES-Figure_7.2_LVIA_TopographyWatercourses.pdf
  2. 6.2 Environmental Statement Figure 7.3 – LVIA Public Rights of Way and Other Accesses 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000234-6-2_ES-Figure_7.3_LVIA_PublicRightsOfWay.pdf
  3. 6.2 Environmental Statement Figure 7.4LVIA Landscape Designations 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000235-6-2_ES-Figure_7.4_LVIA_LandscapeDesignations.pdf

  1. 6.2 Environmental Statement Figure 7.5 – LVIA Tranquillity 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000236-6-2_ES-Figure_7.5_LVIA_Tranquility.pdf

  1. 6.2 Environmental Statement Figure 7.6 – LVIA County Landscape Character Areas 3MB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000237-6-2_ES-Figure_7.6_LVIA_CountyLandscapeCharacterAreas.pdf

  1. 135. 2 Environmental Statement Figure 7.7LVIA District Landscape Character Areas 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000238-6-2_ES-Figure_7.7_LVIA_DistrictLandscapeCharacterAreas.pdf

  1. 6.2 Environmental Statement Figure 7.8LVIA Local Landscape Character Areas 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000239-6-2_ES-Figure_7.8_LVIA_LocalLandscapeCharacterAreas.pdf

  1. 6.2 Environmental Statement Figure 7.9LVIA Zone of Theoretical Visibility Proposed Scheme 4MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000240-6-2_ES-Figure_7.9_LVIA_ZoneTheoreticalVisibility_TheScheme.pdf
  1. 6.2 Environmental Statement Figure 7.10 – LVIA Visual Receptor Overview [map: key to photos] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000241-6-2_ES-Figure_7.10_LVIA_VisualReceptorOverview.pdf
  1. 199. 2 Environmental Statement Figure 7.11 -LVIA Visual ReceptorsSheet 1 [map of viewpoints]. 4MB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000242-6-2_ES-Figure_7.11_LVIA_VisualReceptor_Sheet1.pdf

  1. 6.2 Environmental Statement Figure 7.12LVIA Visual Receptors [viewpoints/map] – Sheet 2 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000243-6-2_ES-Figure_7.12_LVIA_VisualReceptors_Sheet2.pdf
  1. 6.2 Environmental Statement Figure 7.13 – LVIA Visual Receptors – Sheet 3[map/viewpoints] 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000244-6-2_ES-Figure_7.13_LVIA_VisualReceptors_Sheet3.pdf

[NB. All photographs are of current situation in summer and winter, unless indicated otherwise]

  1. 6.2 Environmental Statement Figure 7.14 – Representative Viewpoint 1 View east from Byway BSJA4 to the east of Yarnbury Castle 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000245-6-2_ES-Figure_7.14_LVIA_RepresentativeViewpoint1.pdf
  1. 196. 2 Environmental Statement Figure 7.15 – Representative Viewpoint 2 View north-east from Byway STAP5 on the boundary of the Cranborne Chase and West Wiltshire Downs AONB 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000246-6-2_ES-Figure_7.15_LVIA_RepresentativeViewpoint2.pdf
  2. 6.2 Environmental Statement Figure 7.16Representative Viewpoint 3 View north from Byway BSJA3 north-west of Berwick St James. 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000247-6-2_ES-Figure_7.16_LVIA_RepresentativeViewpoint3.pdf
  3. 6.2 Environmental Statement Figure 7.17 – Representative Viewpoint 4 View east from Parsonage Down National Nature Reserve 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000248-6-2_ES-Figure_7.17_LVIA_RepresentativeViewpoint4.pdf
  4. 6.2 Environmental Statement Figure 7.18Representative Viewpoint 5 View south-west from the B3083 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000249-6-2_ES-Figure_7.18_LVIA_RepresentativeViewpoint5.pdf
  5. 6.2 Environmental Statement Figure 7.19Representative Viewpoint 6 View south-east from PRoW (footpath) WSTO4 across High Down 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000250-6-2_ES-Figure_7.19_LVIA_RepresentativeViewpoint6.pdf
  6. 189. 2 Environmental Statement Figure 7.20Representative Viewpoint 7 View south from Byway WSTO4 as it crosses the River Till 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000251-6-2_ES-Figure_7.20_LVIA_RepresentativeViewpoint7.pdf
  7. 6.2 Environmental Statement Figure 7.21Representative Viewpoint 8 View north-east from the A303 River Till Road Bridge on the eastern side of Winterbourne Stoke 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000252-6-2_ES-Figure_7.21_LVIA_RepresentativeViewpoint8.pdf
  8. 6.2 Environmental Statement Figure 7.22Representative Viewpoint 9 View north-west from PRoW (footpath WST011) 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000253-6-2_ES-Figure_7.22_LVIA_RepresentativeViewpoint9.pdf
  9. 6.2 Environmental Statement Figure 7.23Representative Viewpoint View east from Byway WST06A south of Hill Farm Cottages 10 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000254-6-2_ES-Figure_7.23_LVIA_RepresentativeViewpoint10.pdf
  10. 6.2 Environmental Statement Figure 7.24Representative Viewpoint 11 View north from the A360 adjacent to restricted Byway BSJA9 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000255-6-2_ES-Figure_7.24_LVIA_RepresentativeViewpoint11.pdf
  1. 6.2 Environmental Statement Figure 7.25 – Representative Viewpoint 12 View south-west from the western edge of the Stonehenge Visitor Centre 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000256-6-2_ES-Figure_7.25_LVIARepresentativeViewpoint12.pdf
  2. 6.2 Environmental Statement Figure 7.26Representative Viewpoint 13 View south-west from the Stonehenge, Avebury and Associated Sites World Heritage Site interpretation panel viewpoint located at the northern end of the Winterbourne Stoke Group 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000257-6-2_ES-Figure_7.26_LVIA_RepresentativeViewpoint13.pdf
  1. 6.2 Environmental Statement Figure 7.27Representative Viewpoint 14 View south-east from open access land east of the pedestrian gate access to the Winterbourne Stoke Group within the WHS 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000258-6-2_ES-Figure_7.27_LVIA_RepresentativeViewpoint14.pdf
  2. 6.2 Environmental Statement Figure 7.28Representative Viewpoint 15 View north from Byway WCLA1 south-east of the Diamond 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000259-6-2_ES-Figure_7.28_LVIA_RepresentativeViewpoint15.pdf
  3. 6.2 Environmental Statement Figure 7.29Representative Viewpoint 16 View west from access land close to Normanton Gorse 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000260-6-2_ES-Figure_7.29_LVIA_RepresentativeViewpoint16.pdf
  4. 6.2 Environmental Statement Figure 7.30Representative Viewpoint 17 View south-west from Byway AMES12 close to the north side of the existing A303 8MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000261-6-2_ES-Figure_7.30_LVIA_RepresentativeViewpoint17.pdf
  5. 6.2 Environmental Statement Figure 7.31Representative Viewpoint 18 View north-east from Byway AMES11 at Normanton Down 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000262-6-2_ES-Figure_7.31_LVIA_RepresentativeViewpoint18.pdf
  6. 6.2 Environmental Statement Figure 7.32 – Representative Viewpoint 19 View south-west from a Stonehenge, Avebury and Associated Sites World Heritage Site interpretation panel viewpoint located to the south of the Stones 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000263-6-2_ES-Figure_7.32_LVIA_RepresentativeViewpoint19.pdf
  7. 6.2 Environmental Statement Figure 7.33 – Representative Viewpoint 20 View south-east from the Stonehenge, Avebury and Associated World Heritage Sit interpretation panel located on Byway AMES12 adjacent to the Cursus 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000264-6-2_ES-Figure_7.33_LVIA_RepresentativeViewpoint20.pdf
  8. 6.2 Environmental Statement Figure 7.34 – Representative Viewpoint 21 View west from footpath alongside the existing A303, between King Barrow Ridge and Stonehenge Bottom [current] 14MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000265-6-2_ES-Figure_7.34_LVIA_RepresentativeViewpoint21.pdf
  9. 6.2 Environmental Statement Figure 7.35 – Representative Viewpoint 22 View west from the Stonehenge, Avebury and Associated World Heritage Site interpretation panel viewpoint located at the eastern end of The Cursus 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000266-6-2_ES-Figure_7.35_LVIA_RepresentativeViewpoint22.pdf

  1. 6.2 Environmental Statement Figure 7.36Representative Viewpoint 23 View west from the Stonehenge, Avebury and Associated World Heritage Site interpretation panel viewpoint where the Avenue crosses King Barrow Ridge 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000267-6-2_ES-Figure_7.36_LVIA_RepresentativeViewpoint23.pdf

  1. 6.2 Environmental Statement Figure 7.37Representative Viewpoint 24 View north from the Permissive Path across Coneybury Hill tumulus 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000268-6-2_ES-Figure_7.37_LVIA_RepresentativeViewpoint24.pdf
  2. 6.2 Environmental Statement Figure 7.38 – Representative Viewpoint 25 View south-east from Bridleway AMES39 to the rear of properties at Strangways 2MB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000269-6-2_ES-Figure_7.38_LVIA_RepresentativeViewpoint25.pdf

  1. 6.2 Environmental Statement Figure 7.39Representative Viewpoint 26 View south from Bridleway AMES9A north of the Nile Clump 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000270-6-2_ES-Figure_7.39_LVIA_RepresentativeViewpoint26.pdf
  2. 6.2 Environmental Statement Figure 7.40Representative Viewpoint 27 View north from Stonehenge Road layby, West Amesbury 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000271-6-2_ES-Figure_7.40_LVIA_RepresentativeViewpoint27.pdf
  3. 6.2 Environmental Statement Figure 7.41Representative Viewpoint 28 View south-west from WHS interpretation panel viewpoint located in access land approximately 100m west of Woodhenge monument 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000272-6-2_ES-Figure_7.41_LVIA_RepresentativeViewpoint28.pdf
  1. 6.2 Environmental Statement Figure 7.42Representative Viewpoint 29 View south from residential properties in Durrington 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000273-6-2_ES-Figure_7.42_LVIA_RepresentativeViewpoint29.pdf
  1. 6.2 Environmental Statement Figure 7.43Representative Viewpoint 30 View south from the A345 at the exit from Countess Services on the north side of Countess Roundabout [current] 18MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000274-6-2_ES-Figure_7.43_LVIA_RepresentativeViewpoint30.pdf
  2. 6.2 Environmental Statement Figure 7.44 – Representative Viewpoint 31 View north-west from the Lord’s Walk footpath alongside the River Avon in the north of Amesbury 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000275-6-2_ES-Figure_7.44_LVIA_RepresentativeViewpoint31.pdf
  3. 6.2 Environmental Statement Figure 7.45Representative Viewpoint 32 View south-west from Bridleway AMES6, between Ratfyn and Bulford 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000276-6-2_ES-Figure_7.45_LVIA_RepresentativeViewpoint32.pdf
  1. 6.2 Environmental Statement Figure 7.46 – Representative Viewpoint 33 View north-west from the Allington Track 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000277-6-2_ES-Figure_7.46_LVIA_RepresentativeViewpoint33.pdf
  1. 6.2 Environmental Statement Figure 7.47 – Representative Viewpoint 34 View west from Beacon Hill 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000278-6-2_ES-Figure_7.47_LVIA_RepresentativeViewpoint34.pdf
  1. 6.2 Environmental Statement Figure 7.48 – Representative Viewpoint 35 View north-west from Permissive Path adjacent to Fargo Plantation 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000279-6-2_ES-Figure_7.48_LVIA_RepresentativeViewpoint35.pdf
  2. 6.2 Environmental Statement Figure 7.49Representative Viewpoint 36 View south-east from residential property at Rollestone Junction 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000280-6-2_ES-Figure_7.49_LVIA_RepresentativeViewpoint36.pdf
  3. 6.2 Environmental Statement Figure 7.50LVIA Dark Skies [map] 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000281-6-2_ES-Figure_7.50_LVIA_DarkSkies.pdf

[Photographs of present and proposed views]

  1. 6.2 Environmental Statement Figure 7.51 – Viewpoint 05 Winter View South from the B3083 [present and proposed] 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000282-6-2_ES-Figure_7.51_LVIA_Viewpoint05_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.52Viewpoint 05 Summer View South from the B3083 [present and proposed] 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000283-6-2_ES-Figure_7.52_LVIA_Viewpoint05_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.53 – Viewpoint 08 Winter View North-east from the A303 River Till Road Bridge on the Eastern Edge of Winterbourne Stoke.  [present and proposed] 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000284-6-2_ES-Figure_7.53_LVIA_Viewpoint08_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.54Viewpoint 08 Summer View North-east from the A303 River Till Road Bridge on the Eastern Edge of Winterbourne Stoke [photos] [present and proposed] 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000285-6-2_ES-Figure_7.54_LVIA_Viewpoint08_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.55Viewpoint 10 Winter View East from Byway WSTO6A Adjacent to Hill Farm Cottages [present and proposed] 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000286-6-2_ES-Figure_7.55_LVIA_Viewpoint10_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.56Viewpoint 10 Summer View East from Byway WSTO6A Adjacent to Hill Farm Cottages [present and proposed] 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000287-6-2_ES-Figure_7.56_LVIA_Viewpoint10_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.57Viewpoint 13 Winter view south-west from the Stonehenge, Avebury and Associated Sites World Heritage Site Interpretation Panel Viewpoint Located at the Northern End of the Winterbourne Stoke Group [present and proposed] 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000288-6-2_ES-Figure_7.57_LVIA_Viewpoint13_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.58Viewpoint 13 Summer view south-west from the Viewpoint Located at the Northern End of the Winterbourne Stoke Group [present and proposed] 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000289-6-2_ES-Figure_7.58_LVIA_Viewpoint13_Summer.pdf
  2. 6.2 Environmental Statement Figure 7.59 – Viewpoint 14  Winter View south-east from open access land east of the pedestrian access gate to the Winterbourne Stoke Group [present and proposed]3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000290-6-2_ES-Figure_7.59_LVIA_Viewpoint14_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.60 – Viewpoint 14  Summer View south-east from open access land east of the pedestrian access gate to the Winterbourne Stoke Group [present and proposed]3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000291-6-2_ES-Figure_7.60_LVIA_Viewpoint14_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.61: Viewpoint 19 winter view east adjacent to the Stonehenge monument [present and proposed]3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000292-6-2_ES-Figure_7.61_LVIA_Viewpoint19_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.62Viewpoint 19 summer view east adjacent to the Stonehenge monument [present and proposed] 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000293-6-2_ES-Figure_7.62_LVIA_Viewpoint19_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.63Viewpoint 23 winter view west from the Stonehenge, Avebury and Associated Sites World Heritage Site Interpretation Panel Viewpoint located where the avenue crosses King Barrow Ridge 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000294-6-2_ES-Figure_7.63_LVIA_Viewpoint23_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.64 – Viewpoint 23 summer view  west from the Stonehenge, Avebury and Associated Sites World Heritage Site Interpretation Panel Viewpoint located where the avenue crosses King Barrow Ridge [present and proposed] 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000295-6-2_ES-Figure_7.64_LVIA_Viewpoint23_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.65Viewpoint 26 winter view south from bridleway AMES9A North of the Nile Clumps [present and proposed] 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000296-6-2_ES-Figure_7.65_LVIA_Viewpoint26_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.66Viewpoint 26 summer view south from bridleway AMES9A North of the Nile Clumps [present and proposed] 2MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000297-6-2_ES-Figure_7.66_LVIA_Viewpoint26_Summer.pdf
  1. 6.2 Environmental Statement Figure 7.67Viewpoint 30 winter view south from the A345 at the exit to Countess Services on the North side of the Countess roundabout 23MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000298-6-2_ES-Figure_7.67_LVIA_Viewpoint30_Winter.pdf
  1. 6.2 Environmental Statement Figure 7.68Viewpoint 30 summer view south from the A345 at the exit to Countess Services on the North side of the Countess roundabout [present and proposed] 24MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000299-6-2_ES-Figure_7.68_LVIA_Viewpoint30_Summer.pdf
  1. 6.2 Environmental Statement Figure 8.1: Statutory Designated Sites of International Importance 6MB.[SPA and SAC] https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000300-6-2_ES-Figure_8.1_SitesOfInternationalImportance.pdf
  1. 6.2 Environmental Statement Figure 8.2 – Statutory Designated Sites of National Importance [map]. 6MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000301-6-2_ES-Figure_8.2_SitesOfNationalImportance.pdf
  1. 6.2 Environmental Statement Figure 8.3Non-statutory Designated Sites [County wildlife and RSPB] 5MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000302-6-2_ES-Figure_8.3_NonStatutoryDesignatedSites.pdf

  1. 6.2 Environmental Statement Figure 8.4 – Habitats of Principal Importance 5MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000303-6-2_ES-Figure_8.4_PrincipalHabitats.pdf

  1. 6.2 Environmental Statement Figure 8.5 A-DPhase 1 Habitat Surveys 15MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000304-6-2_ES-Figure_8.5_Phase1_HabitatSurvey.pdf

  1. 6.2 Environmental Statement Figure 8.6 A-D – Botany and lichen survey areas and important hedgerows 13MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000305-6-2_ES-Figure_8.6_BotanyAndLichenSurveyAreas.pdf
  2. 6.2 Environmental Statement Figure 8.7 – Locations of macro-invertebrate, fish, Desmoulin’s Snail and terrestrial invertebrate surveys 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000306-6-2_ES-Figure_8.7_Macro-Invertebrate_Fish_Desmoulin’sSnail_TerrestrialInvertebrate_Surveys.pdf

  1. 6.2 Environmental Statement Figure 8.8Great Crested Newt Survey Results 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000307-6-2_ES-Figure_8.8_GCN_Survey.pdf

  1. 6.2 Environmental Statement Figure 8.9 – Reptiles Habitat Suitability 14MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000308-6-2_ES-Figure_8.9_ReptileHabitat.pdf

  1. 6.2 Environmental Statement Figure 8.10Barn Owl Habitat Suitability and Road Casualties 6MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000309-6-2_ES-Figure_8.10_BarnOwlHabitat_Mortalities.pdf

133.[BLANK] 6.2 Environmental Statement Figure 8.11Schedule 1 and Annex 1 Bird Species – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB.  https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000310-6-2_ES-Figure_8.11_Schedule1_Annex1_BirdSpecies%20(CONFIDENTIAL).pdf

  1. 6.2 [BLANK] Environmental Statement Figure 8.12Badger Setts – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000311-6-2_ES-Figure_8.12_BadgerSetts%20(CONFIDENTIAL).pdf

  1. [BLANK] 6.2 Environmental Statement Figure 8.13 A-D – Bat Roost Survey Results – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000312-6-2_ES-Figure_8.13_BatRoosts%20(CONFIDENTIAL).pdf.
  2. 6.2 Environmental Statement Figure 8.14Bat Activity Transects and Bat Crossing Point Surveys 6MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000313-6-2_ES-Figure_8.14_BatActivity_TransectAndCrossingPoint.pdf
  1. 6.2 Environmental Statement Figure 8.15 A-BBat activity static monitoring survey 8MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000314-6-2_ES-Figure_8.15_BatActivity_Monitoring.pdf

  1. 6.2 Environmental Statement Figure 8.16 – Water vole survey results 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000315-6-2_ES-Figure_8.16_WaterVole.pdf

  1. [BLANK] 6.2 Environmental Statement Figure 8.17Otter survey results – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000318-6-2_ES-Figure_9.2_NoiseAffectedRoutes.pdf
  1. 6.2 Environmental Statement Figure 9.1Noise Location Plan 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000317-6-2_ES-Figure_9.1_NoiseLocationPlan.pdf

  1. 6.2 Environmental Statement Figure 9.2Noise Affected Routes 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000318-6-2_ES-Figure_9.2_NoiseAffectedRoutes.pdf

  1. 6.2 Environmental Statement Figure 9.3 Long term change in do-minimum traffic noise levels 11MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000319-6-2_ES-Figure_9.3_LongTermChanges_2041DM-2026DM.pdf
  1. 6.2 Environmental Statement Figure 9.4Short term change in traffic noise levels 12MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000320-6-2_ES-Figure_9.4_ShortTermChanges_2026DS-2026DM.pdf 

  1. 6.2 Environmental Statement Figure 9.5Long term change in traffic noise levels 12MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000321-6-2_ES-Figure_9.5_LongTermChanges_2041DS-2026DM.pdf

Figure 10.1 Land contamination assessment flow chart (Embedded in Chapter 10, Volume 1)

  1. 6.2 Environmental Statement Figure 10.2 – Geology and Soils Study Area 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000322-6-2_ES-Figure_10.2_GeologySoilsStudyArea.pdf
  2. 6.2 Environmental Statement Figure 10.3 – Early Phase Ground Investigation Exploratory Hole Plan 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000323-6-2_ES-Figure_10.3_EarlyPhase_GroundInvestigation.pdf
  3. 6.2 Environmental Statement Figure 10.4 A-B – Historical Exploratory Hole Location Plan Sheet 7MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000324-6-2_ES-Figure_10.4_HistoricalExploratoryHolesPlan.pdf
  1. 6.2 Environmental Statement Figure 10.5 – Groundwater Source Protection Zones, Groundwater Abstractions, and Rivers within the Geology and Soils Study Area 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000325-6-2_ES-Figure_10.5_GroundwaterSPZ_Abstractions_Rivers.pdf
  2. 6.2 Environmental Statement Figure 10.6 – Potential Land Use Sources and Baseline Ratings of Contamination 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000326-6-2_ES-Figure_10.6_LandUses_PotentialContaminationBaseline.pdf
  3. 6.2 Environmental Statement Figure 10.7 – Geo-Environmental Testing Locations. 3MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000327-6-2_ES-Figure_10.7_GeoEnvironmentalTesting.pdf
  4. 6.2 Environmental Statement Figure 11.1 – Water Study Area 7MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000328-6-2_ES-Figure_11.1_WaterStudyArea.pdf
  5. 6.2 Environmental Statement Figure 11.2 – Surface Water Monitoring 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000329-6-2_ES-Figure_11.2_SurfaceWaterMonitoring.pdf
  6. 6.2 Environmental Statement Figure 11.3 – Geology and Groundwater Monitoring Locations 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000330-6-2_ES-Figure_11.3_Geology_GroundwaterMonitoring.pdf
  7. 6.2 Environmental Statement Figure 11.4 – Groundwater Abstraction and Source Protection Areas  5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000331-6-2_ES-Figure_11.4_GroundwaterAbstractions_SPZ.pdf

Figure 12.1 Waste Hierarchy (Embedded in Chapter 12, Volume 1)

  1. 6.2 Environmental Statement Figure 13.1 – Agricultural Land Classifcation Plan 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000332-6-2_ES-Figure_13.1_AgriculturalLandClassification.pdf
  2. 6.2 Environmental Statement Figure 13.2 – Existing NMUs [public RoW] 4MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000333-6-2_ES-Figure_13.2_ExistingNMUs.pdf
  3. 6.2 Environmental Statement Figure 13.3 – Proposed NMUs [RoW] 5MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000334-6-2_ES-Figure_13.3_ProposedNMUs.pdf

[No Fig. 14]

  1. 6.2 Environmental Statement Figure 15.1 – Zones of influence for consideration of other development 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000335-6-2_ES-Figure_15.1_ZonesOfInfluence_Development.pdf
  2. 6.2 Environmental Statement Figure 15.2 – Other development with potential for cumulative effects 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000336-6-2_ES-Figure_15.2_OtherDevelopment_CumulativeEffects.pdf 

ES VOL. 3.  APPENDICES (DCO doc. ref. 6.3)

  1. 6.3 Environmental Statement Appendix 0.0 – Table of Contents [Appendices] 56KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000337-6-3_ES-Appendix_0.0_TableOfContents.pdf

  1. 6.3 Environmental Statement Appendix 1.1Competent expert table [names of experts on topics]116KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000338-6-3_ES-Appendix_1.1_CompetentExpertTable.pdf
  1. Environmental Statement Appendix 2.1Environmental Mitigation Schedule 127KB [Landscaping, planting, access, bridges, fencing etc.]

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000339-6-3_ES-Appendix_2.1_EnvMitigationSchedule.pdf

  1. 6.3 Environmental Statement Appendix 2.2 – Outline Environmental Management Plan [Construction measures] 23MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000340-6-3_ES-Appendix_2.2_OEMP.pdf 

[No Appx. 3]

  1. Environmental Statement Appendix 4.1 – Scoping Opinion and Late Scoping Consultation Responses [Scoping Opinion November 2017] 2MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000341-6-3_ES-Appendix_4.1_ScopingOpinionResponse.pdf

6.3 Environmental Statement Appendix 4.2Major Accidents and Disasters Long List 159KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000342-6-3_ES-Appendix_4.2_MajorAccidentsDisasters.pdf

  1. 6.3 Environmental Statement Appendix 5.1Air quality monitoring data 117KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000343-6-3_ES-Appendix_5.1_AQ_MonitoringData.pdf

  1. 6.3. Environmental Statement Appendix 5.2Air quality methodology 182KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000344-6-3_ES-Appendix_5.2_AQ_Methodology.pdf

84.6.3.  Environmental Statement Appendix 5.3Air quality results tables 216KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000345-6-3_ES-Appendix_5.3_AQResults.pdf

  1. 6.3 Environmental Statement Appendix 5.4Construction air quality and mitigation186KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000346-6-3_ES-Appendix_5.4_Construction_AQ_Mitigation.pdf
  2. 6.3 Environmental Statement Appendix 5.5Non-significant effects 104KB. [Air Quality] https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000346-6-3_ES-Appendix_5.4_Construction_AQ_Mitigation.pdf 186KB

[CULTURAL HERITAGE]

  1. 6.3 Environmental Statement Appendix 6.1 – Heritage Impact Assessment 12MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000348-6-3_ES-Appendix_6.1_HIA.pdf

  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 1-4 36MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000349-6-3_ES-Appendix_6.1_HIA_Figures%201-4.pdf

  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 5-6 28MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000350-6-3_ES-Appendix_6.1_HIA_Figures5-6.pdf

  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 7-8 31MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000351-6-3_ES-Appendix_6.1_HIA_Figures7-8.pdf

  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 9-10 50MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000352-6-3_ES-Appendix_6.1_HIA_Figures9-10.pdf
  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 11-13

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000353-6-3_ES-Appendix_6.1_HIA_Figures11-13.pdf 29MB

  1. 6.3 Environmental Statement Appendix 6.1Heritage Impact Assessment Figures 14-19

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000354-6-3_ES-Appendix_6.1_HIA_Figures14-19.pdf 27MB

  1. 6.3 Environmental Statement Appendix 6.1 Annex 1 – Heritage and tourism planning and policy context 451KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000355-6-3_ES-Appendix_6.1_HIA_Annex%201_HeritagePlanningPolicyContext.pdf
  1. Environmental Statement Appendix 6.1 Annex 2Inventory with summary descriptions.

[OUV Heritage assets: groups etc; + interventions in the past.]

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000356-6-3_ES-Appendix_6.1_HIA_Annex%202_Inventory.pdf 2MB

87.6.3. Environmental Statement Appendix 6.1 Annex 3Summary of assessment of impact and effects  [Inventory with summary descriptions of Asset Groups that convey the Attributes of the OUV of the WHS] 491KB  https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000357-6-3_ES-Appendix_6.1_HIA_Annex%203_SummaryOfImpacts.pdf

  1. 6.3. Environmental Statement Appendix 6.1 Annex 4 Previous archaeological and antiquarian investigations within the Stonehenge part of the WHS 26MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000358-6-3_ES-Appendix_6.1_HIA_Annex%204_PreviousArchaeologicalInvestigations_StonehengeWHS.pdf
  1. 6.3 Environmental Statement Appendix 6.1 Annex 5 – Astronomy and Archaeoastronomy 20MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000359-6-3_ES-Appendix_6.1_HIA_Annex%205_AstronomyArchaeoastronomy.pdf
  1. 6.3 Environmental Statement Appendix 6.1 Annex 6Influences of the monuments and landscape of the Stonehenge part of the Word Heritage Site on architects, historians and archaeologists 361KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000360-6-3_ES-Appendix_6.1_HIA_Annex%206_InfluencesOnHistorians.pdf

  1. 6.3 Environmental Statement Appendix 6.1 Annex 7 – Influences of the monuments and landscape of the Stonehenge part of the World Heritage Site on artists 10MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000361-6-3_ES-Appendix_6.1_HIA_Annex%207_InfluencesOnArtists.pdf

  1. 6.3 Environmental Statement Appendix 6.2Archaeology Baseline Report 619KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000364-6-3_ES-Appendix_6.2_ArchaeologicalBaselineReport.pdf

  1. 6.3 Environmental Statement Appendix 6.3: Gazetteer of Archaeological Assets 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000365-6-3_ES-Appendix_6.3_ArchaeologicalGazetteer.pdf

  1. 6.3 Environmental Statement Appendix 6.4Historic Buildings Baseline Report 425KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000366-6-3_ES-Appendix_6.4_HistoricBuildingsBaseline.pdf

  1. Environmental Statement Appendix 6.5Gazetteer of Historic Buildings 517KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000367-6-3_ES-Appendix_6.5_HistoricBuildingsGazetteer.pdf

  1. 6.3 Environmental Statement Appendix 6.6Historic Landscape Baseline Report 446KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000368-6-3_ES-Appendix_6.6_HistoricLandscapeBaseline.pdf

  1. 6.3. Environmental Statement Appendix 6.7Gazetteer of Asset Groups [cultural heritage] 5MB [labelled 6.2 in published list but 6.3. on doc.]

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000369-6-3_ES-Appendix_6.7_AssetGroupGazetteer.pdf

  1. 6.3 Environmental Statement Appendix 6.8Cultural Heritage – Summary of non-significant effects 648KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000370-6-3_ES-Appendix_6.8_SummaryNonSignficantEffects.pdf
  1. 6.3 Environmental Statement Appendix 6.9 – Cultural Heritage Setting Assessment 40MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000371-6-3_ES-Appendix_6.9_SettingAssessment.pdf

  1. 6.3 Environmental Statement Appendix 6.10Previous archaeological and antiquarian investigations within the Stonehenge World Heritage Site and its environs 26MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000372-6-3_ES-Appendix_6.10_historicalInvestigations_StonehengeWHS.pdf

  1. 6.3 Environmental Statement Appendix 6.11Outline Archaeological Mitigation Strategy 7MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000373-6-3_ES-Appendix_6.11_ArchaeologicalMitigationStrategy.pdf
  1. 6.3 Environmental Statement Appendix 7.1LVIA Policy 243KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000374-6-3_ES-Appendix_7.1_LVIA_Policy.pdf

  1. 6.3 Environmental Statement Appendix 7.2LVIA Methodology 248KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000375-6-3_ES-Appendix_7.2_LVIA_Methodology.pdf

  1. 6.3 Environmental Statement Appendix 7.3LVIA Area of Search 6MB [Landscape visual impact area] https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000376-6-3_ES-Appendix_7.3_LVIA_AreaOfSearch.pdf
  1. 6.3 Environmental Statement Appendix 7.4Published Landscape Character Assessments 290KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000377-6-3_ES-Appendix_7.4_PublishedLandscapeCharacterAssessments.pdf
  1. 6.3 Environmental Statement Appendix 7.5: Local Landscape and Townscape Character Areas 6MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000378-6-3_ES-Appendix_7.5_LocalLandscapeTownscapeCharacterAreas.pdf
  1. 6.3 Environmental Statement Appendix 7.6Visual Baseline 290KB [landscape]

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000379-6-3_ES-Appendix_7.6_VisualBaseline.pdf

  1. 6.3 Environmental Statement Appendix 7.7 Schedule of Landscape Effects 326KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000380-6-3_ES-Appendix_7.7_LandscapeEffects.pdf

  1. 6.3 Environmental Statement Appendix 7.8Schedule of Visual Effects 378KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000381-6-3_ES-Appendix_7.8_VisualEffects.pdf

  1. 6.3 Environmental Statement Appendix 7.9Future Baseline Schemes. 163KB

[Proposed/agreed devt around WHS] https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000382-6-3_ES-Appendix_7.9_FutureBaselineSchemes.pdf

  1. 6.3 Environmental Statement Appendix 7.10Arboricultural Impact Assessment 19MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000383-6-3_ES-Appendix_7.10_ArboriculturalImpactAssessment.pdf

  1. 6.3 Environmental Statement Appendix 7.11Visually verifiable montage methodology 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000384-6-3_ES-Appendix_7.11_VisuallyVerifiableMontageMethodology.pdf

  1. Environmental Statement Appendix 8.1A – Desk study summary tables [protected species]

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000385-6-3_ES-Appendix_8.1A_DeskStudySummary.pdf 676KB

  1. 6.3 Environmental Statement Appendix 8.1B – Baseline valuation 541KB
  • Table 8-1: Summary of the habitats recorded within the study area and their priority status
  • Table 8-2: Summary results table for terrestrial invertebrates
  • Table 8-3: Summary results of the breeding bird surveys
  • Table 8-4: Badger setts identified during the baseline surveys
  • Table 8-5: Confirmed roosts identified during the 2017 roost surveys of the buildings and built structures
  • Table 8-6: Summary of tree roosts identified during the aerial tree climbing surveys
  • Table 8-7: Summary of the suitability of trees within the study area to support roosting bats
  • Table 8-8: Summary of crossing point survey results
  • Table 8-9: Bats recorded during the surveys and their status (Ref 8.55)
  • Table 8-10: Summary table of evaluation of biodiversity features

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000386-6-3_ES-Appendix_8.1B_BaselineValuation.pdf

  1. 6.3 Environmental Statement Appendix 8.2A – Stonehenge Lichen report 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000387-6-3_ES-Appendix_8.2A_StonehengeLichenReport.pdf

  1. Environmental Statement Appendix 8.2BBeacon hill lichen report 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000388-6-3_ES-Appendix_8.2B_BeaconHillLichenReport.pdf

  1. 6.3 Environmental Statement Appendix 8.2C – Parsonage down lichen report 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000389-6-3_ES-Appendix_8.2C_ParsonageDownLichenReport.pdf

 

  1. 6.3 Environmental Statement Appendix 8.3APhase 1 habitat survey report 6MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000390-6-3_ES-Appendix_8.3A_Phase1_HabitatSurvey.pdf

 

  1. 6.3 Environmental Statement Appendix 8.3BUpdate surveys technical note 432KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000391-6-3_ES-Appendix_8.3B_StudyAreaUpdateSurvey.pdf

  • Table 1: Survey dates and weather conditions .
  • Table 2: Extra trees with bat roost potential located within 200m of the proposed scheme boundary
  • Table 3: Extra waterbodies located within 500m of the proposed scheme boundary and reasons for
  • scoping out from further survey
  1. 6.3 Environmental Statement Appendix 8.4 – Botanical survey report 12MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000392-6-3_ES-Appendix_8.4_BotanicalSurveyReport.pdf

  1. 6.3 Environmental Statement Appendix 8.5 – Hedgerow survey report 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000393-6-3_ES-Appendix_8.5_HedgerowSurveyReport.pdf

  1. 6.3 Environmental Statement Appendix 8.6A – River Habitat Survey River Avon 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000394-6-3_ES-Appendix_8.6A_RiverAvonHabitatSurvey.pdf

  1. 6.3 Environmental Statement Appendix 8.6BRiver Habitat Survey River Till 3MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000395-6-3_ES-Appendix_8.6B_RiverTill_HabitatSurvey.pdf

  1. 6.3 Environmental Statement Appendix 8.7AAquatic macrophyte survey River Avon 372KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000396-6-3_ES-Appendix_8.7A_RiverAvon_AquaticMacrophyte.pdf

  1. 6.3 Environmental Statement Appendix 8.7BAquatic macrophyte survey River Till 406KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000397-6-3_ES-Appendix_8.7B_RiverTill_AquaticMacrophyte.pdf

  1. 6.3 Environmental Statement Appendix 8.8 – Desmoulin’s whorl snail survey report 9MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000398-6-3_ES-Appendix_8.8_DesmoulinsWhorlSnailSurvey.pdf

  1. 6.3 Environmental Statement Appendix 8.9A – Aquatic macro-invertebrate survey River Avon 373KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000399-6-3_ES-Appendix_8.9A_RiverAvon_AquaticMacroInvertebrateSurvey.pdf
  1. 6.3 Environmental Statement Appendix 8.9B – Aquatic macro-invertebrate survey River Till 407KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000400-6-3_ES-Appendix_8.9B_RiverTill_AquaticMacroInvertebrateSurvey.pdf
  1. 6.3 Environmental Statement Appendix 8.9C – Aquatic macro-invertebrate survey Amesbury springs 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000401-6-3_ES-Appendix_8.9C_AmesburySprings_AquaticMacroInvertebrateSurvey.pdf
  1. 6.3 Environmental Statement Appendix 8.10 – White clawed crayfish survey report 11MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000402-6-3_ES-Appendix_8.10_WhiteClawedCrayfish.pdf

  1. 6.3 Environmental Statement Appendix 8.11Invertebrate survey report 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000403-6-3_ES-Appendix_8.11_InvertebrateSurveyReport.pdf

  1. 6.3 Environmental Statement Appendix 8.12A – Fish survey report River Avon 760KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000404-6-3_ES-Appendix_8.12A_RiverAvon_FishSurvey.pdf

  1. 6.3 Environmental Statement Appendix 8.12BFish survey reports River Till 366KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000405-6-3_ES-Appendix_8.12B_RiverTill_FishSurvey.pdf

  1. 6.3 Environmental Statement Appendix 8.13Amphibian survey report 10M

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000406-6-3_ES-Appendix_8.13_AmphibianSurveyReport.pdf

  1. 6.3 Environmental Statement Appendix 8.14Reptiles survey report (2003) 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000407-6-3_ES-Appendix_8.14_ReptileSurveyReport.pdf

  1. [BLANK] Environmental Statement Appendix 8.15Breeding bird and quail survey report – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000408-6-3_ES-Appendix_8.15_BreedingBird_QuailSurvey%20(CONFIDENTIAL).pdf 7KB
  2. [BLANK] Environmental Statement Appendix 8.16ABadger survey report – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000409-6-3_ES-Appendix_8.16A_BadgerSurveyReport%20(CONFIDENTIAL).pdf

  1. [BLANK] Environmental Statement Appendix 8.16BBadger and otter survey report update 2018 – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000410-6-3_ES-Appendix_8.16B_BadgerOtterSurvey%20(CONFIDENTIAL).pdf
  1. Environmental Statement Appendix 8.17: Bat activity report 30MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000411-6-3_ES-Appendix_8.17_BatActivityReport.pdf

  1. Environmental Statement Appendix 8.18Bat crossing point survey report 5MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000412-6-3_ES-Appendix_8.18_BatCrossingPointSurvey.pdf

  1. [BLANK] Environmental Statement Appendix 8.19Advanced bat survey report – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000413-6-3_ES-Appendix_8.19_AdvancedBatSurveyReport%20(CONFIDENTIAL).pdf 7KB

  1. [BLANK] Environmental Statement Appendix 8.20Bat roost survey report – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000414-6-3_ES-Appendix_8.20_BatRoostSurveyReport%20(CONFIDENTIAL).pdf
  1. 6.3 Environmental Statement Appendix 8.21 – Hazel dormouse survey report 22MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000415-6-3_ES-Appendix_8.21_HazelDormouse.pdf

  1. [BLANK] Environmental Statement Appendix 8.22 – Riparian mammal survey report – This report contains confidential information which has been redacted. Therefore a non-redacted version of this document is only available on request to those who have a legitimate need to view the Information 7KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000416-6-3_ES-Appendix_8.22_RiparianMammalSurvey%20(CONFIDENTIAL).pdf
  1. 6.3 Environmental Statement Appendix 8.23Summary of non-significant effects for construction and operation 192KB.

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000417-6-3_ES-Appendix_8.23_SummaryNonSignificantEffects.pdf

  1. 6.3 Environmental Statement Appendix 8.24Habitat Regulations Assessment (HRA) Likely Significant Effects Report 560KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000418-6-3_ES-Appendix_8.24_HRA_LikelySignificantEffects.pdf
  1. 6.3 Environmental Statement Appendix 8.25 – Habitat Regulations Assessment (HRA) 5MB

Statement to inform AA https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000419-6-3_ES-Appendix_8.25_HRA_AppropriateAssessment.pdf 

  1. 6.3 Environmental Statement Appendix 8.26Outline Landscape and Ecology Management Plan https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000420-6-3_ES-Appendix_8.26_OLEMP.pdf 741KB
  2. 6.3 Environmental Statement Appendix 9.1Noise and Vibration Terminology. 155KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000421-6-3_ES-Appendix_9.1_NoiseVibrationTerminology.pdf

  1. 6.3 Environmental Statement Appendix 9.2Construction Noise 2MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000422-6-3_ES-Appendix_9.2_ConstructionNoise.pdf

  1. 6.3 Environmental Statement Appendix 9.3Noise Modelling 116KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000423-6-3_ES-Appendix_9.3_NoiseModelling.pdf

  1. 6.3 Environmental Statement Appendix 9.4 Noise Monitoring 1MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000424-6-3_ES-Appendix_9.4_NoiseMonitoring.pdf

  1. 6.3 Environmental Statement Appendix 9.5Noise and Vibration Summary of Effects Tables

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000425-6-3_ES-Appendix_9.5_NoiseVibrationSummaryEffects.pdf 103KB

  1. 6.3 Environmental Statement Appendix 10.1: Preliminary Ground Investigation Report 44MB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000426-6-3_ES-Appendix_10.1_PreliminaryGI_Report.pdf
  2. 6.3 Environmental Statement Appendix 10.2: Contaminated Land Assessment Methodology and Detailed Risk Assessment 776KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000427-6-3_ES-Appendix_10.2_ContaminatedLand_RiskAssessment.pdf
  1. 6.3 Environmental Statement Appendix 10.3 Supplementary Historical Land Use Information 110KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000428-6-3_ES-Appendix_10.3_SupplementaryHistoricalInformation.pdf
  1. 6.3 Environmental Statement Appendix 10.4Preliminary Sources Study Report (Geology etc.) 25MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000429-6-3_ES-Appendix_10.4_PSSR.pdf
  1. 6.3 Environmental Statement Appendix 10.5 – Non-Significant Effects [contamination] 103KB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000430-6-3_ES-Appendix_10.5_NonSignificantEffects.pdf
  2. 6.3 Environmental Statement Appendix 10.6Land Instability Risk Assessment 30MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000431-6-3_ES-Appendix_10.6_LandInstabilityAssessment.pdf

  1. 6.3 Environmental Statement Appendix 11.1Water Quality Risk Assessment 909KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000432-6-3_ES-Appendix_11.1_WaterQualityAssessment.pdf

  1. 6.3 Environmental Statement Appendix 11.2Water Framework Directive Compliance Assessment 21MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000433-6-3_ES-Appendix_11.2_WFD_ComplianceAssessment.pdf
  1. 6.3 Environmental Statement Appendix 11.3Road Drainage Strategy 1MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000434-6-3_ES-Appendix_11.3_RoadDrainageStrategy.pdf

  1. 6.3 Environmental Statement Appendix 11.4Groundwater Risk Assessment 24MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000435-6-3_ES-Appendix_11.4_GroundwaterRiskAssessment.pdf

  1. 6.3 Environmental Statement Appendix 11.5 – Level 3 Flood Risk Assessment  18MB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000436-6-3_ES-Appendix_11.5_Level_3_FRA.pdf

  1. 6.3 Environmental Statement Appendix 11.6Non-Significant Effects [water] 295KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000437-6-3_ES-Appendix_11.6_NonSignificantEffects.pdf 

  1. 6.3 Environmental Statement Appendix 12.1Tunnel Arisings Management Strategy [dealing with tunnel spoil] 3MB https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000438-6-3_ES-Appendix_12.1_TunnelArisingsStrategy.pdf
  1. 6.3 Environmental Statement Appendix 13.1Non-significant effects [access and movement during construction (table)] 104KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000439-6-3_ES-Appendix_13.1_P&C_NonSignificantEffects.pdf

  1. 6.3 Environmental Statement Appendix 14.1Climate resilience baseline188KB. https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000430-6-3_ES-Appendix_10.5_NonSignificantEffects.pdf
  2. 6.3 Environmental Statement Appendix 14.2Summary of climate impact effects 179KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000442-6-3_ES-Appendix_14.2_ClimateImpactEffects.pdf

  1. 6.3 Environmental Statement Appendix 15.1Matrix of other development 532KB

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000443-6-3_ES-Appendix_15.1_MatrixOtherDevelopment.pdf

  1. 6.3 Environmental Statement Appendix 15.2 Assessment matrix [recent and proposed planning permissions in area] 526K

https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010025/TR010025-000444-6-3_ES-Appendix_15.2_AssessmentMatrix.pdf

Please share
Facebooktwittermail